Garden tool
Succession sowing schedule
Enter a crop, a date range and how often you sow, and get every planting date in between. Crops without a reviewed sowing rule stay “not yet verified” — no dates are guessed.
Units: Calendar dates (YYYY-MM-DD), days between plantings, seeds.
Inputs: Crop slug, start and end date, interval (days), seeds per planting.
Method: Dates are stepped from the start date by the interval until the end date, then each date is checked against the reviewed sowing window and blackout months for that exact crop slug.
Some crop figures come from editorial sample data that is still under review. Anything from those samples stays labelled, and a crop with no reviewed rule is never given invented dates or yields.
Your measurements
Result
Enter a crop and a date range to list planting dates at your chosen interval. Crops without a reviewed sowing rule stay “not yet verified” rather than showing invented dates.